We use cookies.

By clicking “Accept All”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Cookie Policy for more information.

Optahunt

Home
Services

PIM Implementation

PIM Implementation

A functional PIM lead on your side, from requirements to go-live. Hands-on Akeneo experienceand a tool-independent method, working with the integrator who builds the platform.

PIM Implementation

For teams about to implement, replace or rescue a PIM

If you have chosen a PIM, or are about to, let's make sure the data model, the owners and themigration plan are ready before the build starts.

The Head of E-commerce

The PIM is signed and you need someone on your side who speaks both business and data.

The Product Data Manager

You will live with the model every day and want it built around how customers shop.

The CIO or Transformation Lead

You need the integration and migration plan to hold across ERP, DAM and channels.

The Team Already Mid-Project

The build has started, decisions keep slipping and the data is not ready.

At a Glance

  • Best for: Brands and retailers starting, replacing or rescuing a PIM implementation with an integrator.
  • Engagement: Client-side PIM lead, phase by phase from discovery to adoption.
  • Budget: Scoped after a first call, per phase or for the full project

What you get

Design documents your integrator can build from and your team can run.

Data Model and Governance Design

Families, attributes, variants, identifiers and owners, written down and agreed before the build.

Integration and Migration Plan

One source of truth per attribute, flows to ERP, DAM and channels, and test loads on real data.

Acceptance Test Plan

Scenarios built on real products and real workflows, so acceptance means something.

Adoption Kit

Role-based training, a data dictionary and simple routines that keep the catalog clean after go-live.

Our Approach

Step by step, led by Yassine, the person you talk to from day one.

  1. 01

    Discovery and Requirements

    Workshops with business, data and IT teams to map products, sources, channels and pain points.

    02

    Data Model and Governance Design

    Families, attributes, identifiers, workflows and owners designed around how customers shop.

    03

    Integration and Migration Plan

    Source of truth per attribute, supplier onboarding and a migration plan with test loads.

    04

    Build Support and Acceptance Testing

    Close work with your integrator and acceptance on real products and workflows.

    05

    Go-Live and Adoption

    Cutover checklist, training per role and the first weeks of daily habits after launch.

This is

  • A client-side lead who works with your integrator, not instead of them.
  • A data model and governance designed before the build starts.
  • A tool-independent method, with hands-on Akeneo experience.
  • Direct work with Yassine, who designs your model.

This is NOT

  • A software reseller or a license sale.
  • A replacement for your integrator's build team.
  • A template data model copied from another catalog.
  • A project that ends at go-live, with nobody using the PIM.

What a PIM Implementation Really Involves

A PIM implementation is the project that turns a PIM license into a product information management system your teams trust. It covers the data model, the rules and owners around it, the connections to your ERP, digital asset management (DAM) and sales channels, the migration of existing product data, and the daily habits that keep data quality high. Buying the PIM software is the quick part. The data model and the people decide if it works. If you need the basics first, the guide to building a PIM implementation plan explains what a PIM system does and why it matters for e-commerce.

Doctor Project works on the client side, as the functional PIM lead next to your integrator. We design the data model, governance, supplier onboarding, migration plan and adoption; your implementation partner builds and configures the platform. Each side does what it does best, and someone on your side holds the full picture of products, data and decisions at the same time. The method is tool-independent, with hands-on Akeneo implementation experience and an Akeneo Foundation certification.

Our PIM Implementation Methodology, Phase by Phase

1. Discovery and Requirements

We start with your products and your customers, not with the software screens. Workshops with stakeholders from e-commerce, product, supply and IT map the product types you sell, the data sources, the channels and markets, and where today's workflow breaks. The output is a set of business requirements written so business and IT read them the same way, and a realistic plan for the next phases.

2. Data Model and Governance Design

This is where most of the value is decided. We design families, product attributes, variants, identifiers and categories around how customers actually shop, so the model scales with the business. Then we define who owns each attribute, who validates it and in which locale. A classification standard like ETIM or GS1 is a shared language between companies; a shopper needs a different structure, and the model has to serve both.

A veterinary distribution platform took this kind of decision before entering new markets, as shown in the case study on catalog architecture for a veterinary platform.

3. Integration and Migration Plan

Every attribute gets one source of truth: ERP, supplier, PIM or DAM. We describe the data flow to each channel, design the supplier onboarding process with clear validation rules, and plan the migration of existing product data with test loads before the final load. Our PIM migration checklist lists the questions we ask at this stage.

4. Build Support and Acceptance Testing

While your integrator configures the PIM platform, we stay close to the work: answering design questions in days, not weeks, checking that each workflow matches the model, and writing acceptance scenarios based on real products. Acceptance then means something, because it is tested on the catalog you will actually run.

Acceptance testing workshops played that role on an Akeneo rollout for a watch and accessories retailer, where business teams were new to PIM.

5. Go-Live and Adoption

Go-live is a starting point. We prepare the cutover checklist, train each role on its own tasks, and stay through the first weeks so that enrichment, validation and supplier updates become routine. Governance is a daily habit, not a document.

PIM Implementation Case Study: When the Supplier Classification Became the Data Model

A European DIY retailer had built its catalog on 1,324 flat families copied from a supplier classification. Each family carried between 196 and 385 attributes, so completeness meant nothing and teams could not tell what was really missing. Configuring the PIM faster would not have helped: the model itself was the problem.

The catalog was restructured into a two-level family model, and 5,181 attributes were reduced to 555 kept for the web. With a clear model in place, the rest of the work became possible. Supplier Excel files were checked with simple scripts (GTIN key, mandatory fields) while a supplier portal was still being deployed. Later, AI enrichment filled 150 previously empty attributes with 80% coverage and an error rate below 5%, because prompts were forced to pick from existing attribute options and never invent values.

The lesson: if the data model is wrong, the tool does not matter. A successful PIM implementation starts with the model, and the customer experience follows.

Working With Your PIM Implementation Partner

An integrator and a client-side PIM implementation consultant do different jobs. The integrator configures, develops and connects the platform. The client-side lead makes sure what is built matches your products, your teams and your channels, and that decisions are taken on time by the right owners. Clear roles usually make the integrator's work easier too, because questions get answers from someone who knows both the business and the data.

We can also help before the partner is chosen: writing the brief, comparing proposals on the same criteria and checking that the scope covers data model, migration and adoption, not only configuration. Our guide on how to brief a PIM vendor shares the method.

Why PIM Implementations Slip

Most delays are ownership problems that look like tool problems. In a content workshop at a global petcare brand, the six pain points raised were about governance, ownership and source of truth, not missing features. When nobody owns an attribute, nobody can decide on it, and the build waits. We cover the usual patterns in why PIM projects fail.

  • Model decisions postponed until the build has already started.
  • Migration tested for the first time a few weeks before go-live.
  • Supplier data expected to arrive clean, with no onboarding process.
  • Training planned as one session at the end, instead of habits per role.

Tell us where your project is today, whether you are choosing a PIM, starting the build or already halfway. In one call, we will tell you what to secure first. You can also read more about how we work as an independent PIM consultant.

Frequently Asked Questions

Practical answers before we talk.

How long does a PIM implementation take?

How much time do our internal teams need to give?

Do we need a consultant if we already have an integrator?

Can you join a PIM implementation that has already started?

Which PIM do you work with?

Proof from the field

50%+Projected cut in catalog maintenance when a veterinary distribution platform replaced duplicated distributor catalogs with one umbrella catalog.

~8% → ~2%Searches returning zero results on a global petcare brand's D2C site, from about 8% to about 2% in a year after catalog rework (figure reported by the client team).

Not sure which service fits ?

Start with aDiscovery Call

Free. 30 minutes. You leave with a clear next step.

Book a discovery call