Client-side Akeneo consulting that reviews how your instance is modeled and used, fixes whathas drifted and trains your teams, with your data model and your business first and the toolsecond.

For teams that already run Akeneo, or have just chosen it
If your Akeneo PIM feels harder to use every quarter, or an edition move is coming, let's look atthe model, the rules and the owners before anything else changes.
The Product Data Manager
Completeness scores nobody trusts, and families that keep multiplying with every supplier.
The Head of E-commerce
New channels and locales are coming, and the PIM needs to keep up with them.
The IT or Platform Owner
An edition move or an end-of-support date is on the calendar and needs a plan.
The Team After a Hard Go-Live
Akeneo is live, but imports, rules and rights have drifted since launch.
At a Glance
- Best for: Brands and retailers that already run Akeneo PIM, or have chosen it, and want it to fit their catalog.
- Engagement: Client-side Akeneo consulting, from a first instance audit to fixes, edition moves and training.
- Budget: Scoped after a first call, per audit, per edition move or as ongoing support
Findings and fixes your team and your integrator can act on.
Akeneo Instance Audit
Families, attributes, variants, completeness, channels, locales and rights, read against how your customers shop.
Prioritized Fix Plan
What to fix first in the model, rules and connectors, each item with an owner and a reason.
Edition Move Plan
Inventory of model, rules, custom code and connectors, cleanup before the move and acceptance tests.
Role-Based Training
Sessions on your own instance and products, per role, plus a data dictionary your team keeps.
Step by step, led by Yassine, the person you talk to from day one.
- 01
Instance Review
Reading your families, attributes, rules, rights and connectors before any interview.
02Team Interviews
Short calls with product, e-commerce and IT owners, and with your integrator.
03Fix Plan
Fixes ordered by impact and effort, from the model to rules, workflows and integrations.
04Fixes With Your Integrator
Design answers in days, and acceptance on real products and real workflows.
05Training and Handover
Role-based training on your instance and routines that keep the catalog clean.
- Client-side Akeneo consulting, next to your integrator.
- A review of your real instance: families, attributes, rights, rules and connectors.
- Fixes that start with the data model, then the configuration.
- Direct work with Yassine, who audits your instance.
- A license sale or a software reseller offer.
- A replacement for your integrator's development team.
- A generic Akeneo demo or feature tour.
- A new tool pitched as the answer to a model problem.
What an Akeneo Consultant Does
An Akeneo consultant helps teams that already run Akeneo PIM, or have just chosen it, get the data model, rules, workflows, integrations and daily habits right inside that platform. Doctor Project works on the client side: we audit how your Akeneo instance is set up, fix what has drifted, prepare moves between editions and train your teams. The software matters, but your product data model and your business come first, because the product experience your customers see, on your website, on marketplaces or in a B2B portal, is only as clear as the model behind it.
If you are still choosing a product information management (PIM) system, or starting a build from zero, our tool-independent PIM implementation service is the better place to start. This page is for teams where Akeneo is already the answer, and the real question is how to make it work for your catalog, your sales channels and your customers.
Akeneo now groups its PIM, DAM, Supplier Data Manager, Activation and other solutions under the name Akeneo Product Cloud (Akeneo Help Center). Our work centers on the Akeneo PIM, where your product data model lives, and on how it connects to everything around it. If you are looking for an Akeneo expert or a freelance Akeneo consultant, you work directly with the person who reads your instance. Every engagement is led by Yassine Fatihi, who holds the Akeneo Foundation certification.
Our Akeneo Consulting Services
Akeneo Instance Audit
We read your instance the way a shopper would meet your catalog, then the way your teams use it every day. The audit covers families and family variants, attributes and attribute groups, product models, categories, channels and locales, completeness rules, user roles and permissions, and the import and export jobs that feed it. The output is a short list of what to fix first, each item with an owner and a reason.
For a global confectionery brand, this kind of review came before scaling to more markets, as described in the Akeneo maturity audit case study.
The usual findings are not exotic. Families copied from a supplier list, the same attribute created three times with three names, completeness that is always green or always red, locales that nobody is assigned to. On a European DIY retailer's catalog, each family carried between 196 and 385 attributes, so completeness meant nothing and teams could not tell what was really missing. For a wider review that also covers contracts, scope and delivery, see our PIM audit.
Rescue of a Drifting Akeneo Project
An Akeneo project rarely breaks in one day. It drifts, often in the months after go-live: a family added for one supplier, a rule written to patch a bad import, a permission given to unblock a deadline. Each choice makes sense alone. Together, they make the PIM slower to use every quarter.
Recovery starts with honest triage, not with new features. We stop the changes that widen the gap, fix the model and the identifiers first, clean the backlog and reset acceptance on real products. Very often the root cause is not Akeneo at all. In a content workshop at a global petcare brand, the six pain points raised were about governance, ownership and source of truth, not missing features. The common patterns are in why PIM projects fail.
Akeneo Upgrades and Moves Between Editions
Akeneo is offered in several editions, and moving between them is a project, not a button. Here is what Akeneo's own pages say today:
- Community Edition is Akeneo's free, open-source PIM that you download, install, host and customize yourself (Akeneo, Community Edition).
- Serenity, the cloud version, is available for Enterprise and Growth customers only, and new features are delivered automatically in the PIM (Akeneo Help Center, PIM versions).
- For its PaaS (Flexibility) and on-premise editions, Akeneo lists September 30, 2026 as the end of support for version 7.0 (Akeneo Help Center, support dates). After that, Enterprise Edition customers have to move to the SaaS version to keep SLA-backed bug patches, according to the same versions page.
- In its October 2024 update, Akeneo added Asset Manager, the Rules Engine and Reference Entities to the Growth Edition, three features that were previously exclusive to the Enterprise Edition (Akeneo Help Center, Growth Edition update).
Editions and support dates change, so we check them again with you at the start of every engagement. Our part is functional: an inventory of families, attributes, rules, custom code and connectors, a decision on what to keep, simplify or drop, data cleanup before the move rather than after, and acceptance tests on real products. If the move includes a full data transfer, our PIM data migration service and the PIM migration checklist cover the rest.
On a B2B equipment distributor's catalog, completing an Akeneo upgrade was part of getting a drifting project back on track, as told in the PIM project recovery case study.
Akeneo Connector and Integration Review
Akeneo sits between your ERP, your digital asset management (DAM) system, your suppliers and your ecommerce platforms and marketplaces. Whether the connector targets Shopify, Adobe Commerce, Salesforce Commerce Cloud or a custom storefront, we review the flows your integrator has built against one simple rule: every attribute has one source of truth. We check which system writes which value, which import can overwrite enriched content, how families and categories map to each channel, and how assets are linked. Supplier files deserve their own review, as we explain in why supplier data breaks PIM projects.
Identifiers get special attention, because an identifier is a promise to the outside world. In a global petcare catalog, 67% of products shared a duplicated barcode, caused by product versioning and low GS1 maturity. Fixing it meant warning distributors for about 4,000 references. The cheapest moment to get identifiers right is the first one.
Akeneo Rules and Workflow Setup
Rules can fill, copy and standardize values at scale, and workflows can route enrichment and approval to the right people. Both work well on a stable model, and both multiply the mess on a weak one. We design them after the model is settled: which attributes a rule may touch, who validates each step, in which locale and for which category. Which features you get depends on your edition, so we start from the plan you actually have.
The same logic applies to AI enrichment: it amplifies the data quality you already have. On a European DIY retailer's catalog, 200 AI configurations and 950 rules filled 150 previously empty attributes with 80% coverage and an error rate below 5%, because prompts were forced to pick from existing attribute options and never invent values. More on this in our AI product data enrichment service.
Akeneo Training for Your Team
Generic Akeneo training shows the screens, and best practices only stick when they are tied to real work. Your team needs to know your families, your completeness rules and their own tasks. We build sessions on your instance and your products, per role: enrichment, validation, translation, administration. See our PIM and DAM team training for formats.
Field Story: Governance on a Luxury Jewelry Catalog
On a luxury jewelry catalog, the data had to describe certificates, stones, carats, metals and provenance with no room for approximation. Precision was not a nice-to-have; it was the trust the brand sold.
The work was less about screens and more about habits: roles, rights per locale and category, translation workflows, and training for merchandising teams in the US and regional teams in South Korea. The lesson travels to any Akeneo instance: governance is a daily habit, not a document.
The full luxury jewelry case study covers the data models, the Akeneo governance by locale and category, and the training in the US and South Korea.
Working With Your Akeneo Integrator
Your integrator configures, develops and maintains the platform. We work on your side on the model, the rules, the owners and the acceptance tests, so design questions get answers in days. We do not sell Akeneo licenses, so the advice stays about your catalog.
How to Choose an Akeneo Consultant
Whoever you work with, a few questions make the choice easier:
- Do they ask about your products, customers and channels before they ask about screens?
- Can they explain how they will test changes on your real products, not on demo data?
- Are they clear about what they do and what your integrator does?
- Will your team be able to run the PIM without them after the engagement?
When to Call an Akeneo Consultant
- Completeness scores that nobody trusts any more.
- Families and attributes that keep multiplying with every new supplier.
- An edition move or an end-of-support date on the calendar.
- Imports or connectors that overwrite enriched content.
- A new team, market or locale joining the PIM.
Tell us which edition you run, what feels stuck and what you want the catalog to do next. In one call, we will tell you where we would start. You can also read how we work as an independent PIM consultant, or go straight to contact.
Practical answers before we talk.
What does an Akeneo consultant do?
Do you replace our Akeneo integrator?
Our Akeneo project is drifting. Where do we start?
Can you help us move to another Akeneo edition?
Can you train our team on Akeneo?
Do you only work with Akeneo?
196 to 385Attributes per family on a European DIY retailer's catalog of 1,324 flat families, so completeness meant nothing.
67%Products sharing a duplicated barcode in a global petcare catalog, caused by product versioning and low GS1 maturity.
Start with aDiscovery Call
Free. 30 minutes. You leave with a clear next step.
Book a discovery call