AI Prompt Architecture for a LinkedInProspecting SaaS

AI Prompt Architecture for a LinkedIn Prospecting SaaS

About the project

The AI layer of a LinkedIn prospecting tool

From September 2023 to January 2025, I worked with a French SaaS that helps sales teams prospect on LinkedIn. My part was the AI layer: the prompts that turn prospect information into usable outreach, and the analytics that show whether that output is actually used.

The Challenge

A prompt that works in a demo is not a prompt that works at scale

A prompt that works once in a demo is easy. A prompt that works for 200 prospects a day, across different profiles and contexts, is a different animal. Every gap in the instructions shows up at scale, and users notice it before you do.

HOW WE FIX ISSUES

Prompt architecture and usage analytics

I designed the prompt architecture: structured instructions, reusable templates and rules that keep the output on topic. Then I followed usage analytics to see which outputs people kept and which they rewrote, and adjusted the prompts from there. The throughput reached 200 prospects a day.

The lesson I now apply to product catalogs: AI amplifies the structure you give it, good or bad. More on that in AI without data governance is noise.

The Toolbox

Technology Stack

OpenAIOpenAI
ClaudeClaude
BrunoBruno